
Services Provided
- Fibre Cabling & Testing
- Cat 6 Cabling & Testing
- Small Power
- Power Distribution Systems
- Containment Systems
- Test & Commission
THE OPPORTUNITY
KBS was proud to receive yet another contract from our long-term client Waitrose & Partners. This project part of a large-scale rollout to upgrade the Wi-Fi connectivity within Waitrose & Partners Stores with this specific one being for the Windsor branch.
THE DELIVERY
Upon working on this project, we were faced with certain difficulties which allowed us to demonstrate our abilities adapt to situations. We were required to survey the site carefully to implement the upgrade where it was discovered that a number of the horizontal CAT 6 cabling would be over the 90m maximum cable length. However, with the help of collaborative working and our skilled team we were able to fully carry out the upgrade. We provided a new DWC closet with Fibre backbone cabling, dedicated backbone containment and small power that were fully designed and installed as well. This DWC has now expanded the stores capabilities. Additionally, we ensured that everything was tested and commissioned, further reflecting our dedication to deliver the highest quality work. In addition to the DWC and Fibre cabling, we also successfully provided mechanical services by installing a new AC unit to keep the DWC within the operating temperatures.
THE OUTCOME
As a team we are proud to state that we ensure our client receives the highest quality work. Feedback from the client included their gratitude and appreciation for our work. As a result of our successful completion, we have received multiple projects from the same client, Waitrose & Partners.
Unit 7 – 8 Forest Court
Oaklands Park, Wokingham RG41 2FD